Green Power Generators

 

The GREEN POWER GENERATOR is a SELF GENERATING Power Supply Unit, not dependent on fuel, solar or wind power.

 

The GREEN POWER GENERATOR makes use of UNIQUE PERMANENT MAGNETIC POWER GENERATING ABILITIES. It is a permanent electricity supply system that takes you off the grid. The product can also be used as a back-up system. 

 

A patent is presently pending and therefore the internal working of the unit cannot be disclosed at this stage.

 

 The 30 KVA unit

 

The GREEN POWER GENERATOR has a wide range of applications, which vary from general household, office use, traffic light powering, telecommunication tower powering, military use and many other applications.

 

The units are currently available in 30 and 60KVA 3 phase and single phase selectable only. Smaller single phase and larger three phase units will be available at a later stage as rigorous testing on these units is still underway. The 30 KVA units produce either three single phase outputs of a combined total of 30KVA or one single 3 phase output of 30KVA. The 60KVA units produce either three single phase outputs of a combined total of 60KVA or one single 3 phase output of 60KVA. Automatic load balancing between the 3 single phase outputs if used as single phase units.

 

 

 Green Power Generator Output

 

 

30 KVA GREEN POWER GENERATOR Output   

                    

Single phase    220v per each of 3 phases

                            58 amps load balanced across all 3 single phase outputs

                            30KVA load balanced across all 3 single phase outputs        

 

3 Phase            380v constant output

                           58amps constant output

                           30KVA maximum output

 

60 KVA GREEN POWER GENERATOR Output                       

 

Single phase   220v per each of 3 phases

                           120 amps load balanced across all 3 single phase outputs

                           60KVA load balanced across all 3 single phase outputs        

 

3 Phase            380v constant output

                          120amps constant output

                          60KVA maximum output

 

 

 

Why Green Power Generators

 

Uninterrupted power.Takes you OFF THE GRID – no longer reliant on Eskom (in some countries you can feed back into grid that which you are not using – thereby earning an income)No more production losses due to electricity interruptionsNo longer affected by Electrical tariff increases – therefore controlling cost of productionLow maintenance costEnvironmentally friendly no emissionslow noise emissions (gentle white noise)low safety hazard/risk 

 

Noise

 

The units run fairly quietly and will make about as much noise as your washing machine.

 

Dimensions

 

30 KVA                                  Length  1.2m     

Width    1.0m

Height   0.6m     

Weight 500 kg

 

60 KVA                                  Length  2.0m     

Width    1.0m     

Height   1.0m     

Weight 550 kg

 

Maintenance and Installation

The GREEN POWER GENERATORS require a maintenance service by a manufacturer certified technicians once every three (3) years, to replace the drive belts.

Installation is to be done by a certified electrician who has experience in the installation of generators. Installation costs are not covered in the purchase of the unit, as installation is done by third party qualified and certified electricians.

As with all generators, the normal care should be given:

< >do not overload the circuit, correct installation by qualified and certified electricians (approved by the supplier) and who carry the correct certification for the voltage and amperage that will be conducted through the wiring installation should not be in a damp or wet environment, the unit should be in a well ventilated environment so as to avoid excess heat, Indication Prices requested at info@htcm.eu

 

 

30KVA dual three and single phase unit 

60KVA dual three and single phase unit 

 

Prices are subject to change – please request a fresh quotation at the time of Interest/placement of order.

 

Prices EXCLUDE:

Delivery & Installation by a Certified & Approved Electrician

 

Payment Terms

 60% Deposit is required upon order and the balance of 40% upon shipment from the factory in Pretoria after inspection and testing by purchaser.

 

Delivery

 

Lead time from order deposit is 4-6 weeks to collection.

All prices are quoted Ex-Works Hamburg,  Germany.

 

Shipping nationwide and internationally can be arranged at an additional fee.

 

Offloading:

 

The units have feet, so offloading can be done with a forklift.

Hooks can be fitted to the Generators for lifting via Cranes or Chain Blocks.

Caster wheels are also available – this may incur an additional cost.